Integrated Power Transformer Loss and Impedance Measurement System for Substation
Integrated Power Transformer Loss and Impedance Measurement System for Substation

Integrated Power Transformer Loss and Impedance Measurement System for Substation

Overview Package Size800.00cm * 800.00cm * 300.00cm Package Gross Weight2000.000kg .lc-a-img { position: relative; width

Send your inquiry

DESCRIPTION

  • Overview
  • Product Description
  • Specification
  • Test Type
Overview
Basic Info.
Model NO. 1
Mass Scope of Workpiece >20000kg
Type Power Transformer Test System
Maxcapacity Na
Accuracy Grade 1
Load Way Na
Loading Method Na
Display PC Software Display
Control Computer Control
Weight Depends on The Specific Situation.
Power Source AC380V
Oil Cylinder Position Na
Test Object Power Transformers / Distribution Transformers / S
Data Acquisition Multi-Channel High-Speed Data Acquisition
Safety Protection Grid-Isolated Operation / Interlock Protection / E
Phase Control Output Phase Sequence Configurable (Optional)
Standards IEC 60076 / IEC 61439 / IEC 60947
Transport Package Containerized Packing / Export Wooden Packing
Specification 2500x1060x1500mm
Trademark launch
Origin China
Packaging & Delivery
Package Size800.00cm * 800.00cm * 300.00cm Package Gross Weight2000.000kg
Product Description

Product Description

PTTS - POWER TRANSFORMER TEST SYSTEM The transformer production line test system is a high-end integrated testing platform integrating automated logistics, intelligent control, data management and standards compliance. Following the assembly-line operation concept, it divides the transformer testing process into multiple specialized test stations. Via automated switching devices and digital management control, it achieves unmanned or minimally manned testing, significantly improving testing efficiency, data accuracy and operational safety.Specification
PTTS
Test ItemStandard
Transformer No-Load/Load TestIEC60076-1
Transformer Induced Voltage TestIEC60076-3/EC60270
Transformer Temperature Rising TestlEC60076-2
Applied Voltage TestIEC60076-3
Impulse Voltage TestIEC60076-4
Transformer Class66kV110kV220kV500kV
Power Source500kVA1000kVA1500kVA1800kVA
Step-up transformer1000kVA2000kVA3000kVA4000kVA
Capacitor Bank10MVar40MVar100MVar180MVar
Impulse Voltage Generator600kV800kV1600kV2400kV
60kJ80kJ160kJ240kJ
AC Test Transformer200kV300kV300kV300kV
1A1A1A1.5A

Test Type Routine Tests: Measurement of D.C. winding resistance.
Measurement of voltage ratio.
Check of voltage vector relationship.
Measurement of No-load loss & current harmonics analysis of No-load current.
Measurement of load loss & short-circuit impedance.
Calculation of total loss, impedance, regulation & efficiency.
Tap changer operation.
Measurement of insulation resistance.
AC voltage withstand test.
Induced AC voltage test with partial discharge.
Measurement of dissipation power factor (tan o) and capacitance.
Bushing current transformer test (BCT). Type Tests: Special Tests: Temperature rise test.
Lightening & switching impulse test.
Sound level test. Sweep frequency response analysis.
Partial discharge tests.
Dissolved Gas Analysis (DGA). Key Features: Integrated platform for routine & type tests of power transformers
Modular configuration, easy to expand and customize
Automatic switching & sequencing to streamline workflow
PLC-based centralized control with data recording & report output
High accuracy measurement and stable test performance
Multi-level safety interlocks for safe high-voltage operation

System Setup & Application

Shanghai Lanqi Electric Co., Ltd.

Shanghai Lanqi Electric Co., Ltd.Launch Electric began with a bold vision: to transform China's high-voltage industry through innovation and engineering excellence. Starting with global imports and local assembly, we've grown into a trusted solutions partner for the power sector. Our journey is defined by precision, reliability, and a deep commitment to quality—delivering systems that meet the evolving demands of modern energy infrastructure.Over the years, we've expanded our capabilities, introduced cutting-edge testing technologies, and built lasting relationships based on trust, performance, and technical expertise. Today, Launch Electric continues to lead the way—pushing boundaries, setting benchmarks, and powering progress across every project we deliver.

Our MissionOur VisionTo drive progress in high-voltage testing through innovation, safeguard energy security with precision and reliability, and empower the sustainable development of global energy infrastructure.To lead the revolution in high-voltage testing with innovative technologies, safeguarding global energy security and a sustainable future.

Skilled GIS ProfessionalsOutfitted with Complete ToolsComprehensive InstallationOur OEM-trained technicians deliver precise diagnostics, swift repairs, and dependable GIS system recovery.Equipped with precision tools like SF6 handling kits, vacuum pumps, detectors, and safety-certified PPE, our teams guarantee secure and accurate servicing.Trained professionals handle all aspects of GIS/AIS services including erection, dismantling, testing, commissioning, shutdowns, and retrofitswith efficiency and expertise.FAQ1. How is our product? We are manufacturer, so preferential price and high quality can guarantee.
2. How soon to get price?
Usually provide within 6 hours once receiving inquiry. If you are very urgent, please call us then we will do in priority.
3. Whal is your terms of delivery?
EXW,FOB, CFR, CIF, ect. Pls select your most conveient and cost effective.
4. When there is difficulty in using ?
We will first provide equipment operation manual, operation video, or provide training through remote video call. Ifnecessary, engineers will serve on door.
5. What about the leading time for production?
That depends on order qty and product item. For normal items, usually within 3 working days. Delivery time is determined by the logistics , generally is 5-7 days.
6.How to send?
For most of our customers, we provide door-to-door service. You only to through import customs clearance proceduresand pay the import tariff.
7. How is packing and will the goods be damaged?
We will pack standard export packing for everyequipment, so far there is no damage yet, pls no worry.

Related Products