
Integrated Power Transformer Loss and Impedance Measurement System for Substation
Overview Package Size800.00cm * 800.00cm * 300.00cm Package Gross Weight2000.000kg .lc-a-img { position: relative; width
Send your inquiryDESCRIPTION
- Overview
- Product Description
- Specification
- Test Type
Basic Info.
| Model NO. | 1 |
| Mass Scope of Workpiece | >20000kg |
| Type | Power Transformer Test System |
| Maxcapacity | Na |
| Accuracy Grade | 1 |
| Load Way | Na |
| Loading Method | Na |
| Display | PC Software Display |
| Control | Computer Control |
| Weight | Depends on The Specific Situation. |
| Power Source | AC380V |
| Oil Cylinder Position | Na |
| Test Object | Power Transformers / Distribution Transformers / S |
| Data Acquisition | Multi-Channel High-Speed Data Acquisition |
| Safety Protection | Grid-Isolated Operation / Interlock Protection / E |
| Phase Control | Output Phase Sequence Configurable (Optional) |
| Standards | IEC 60076 / IEC 61439 / IEC 60947 |
| Transport Package | Containerized Packing / Export Wooden Packing |
| Specification | 2500x1060x1500mm |
| Trademark | launch |
| Origin | China |
Packaging & Delivery
Package Size800.00cm * 800.00cm * 300.00cm Package Gross Weight2000.000kgProduct Description
Product Description
PTTS - POWER TRANSFORMER TEST SYSTEM The transformer production line test system is a high-end integrated testing platform integrating automated logistics, intelligent control, data management and standards compliance. Following the assembly-line operation concept, it divides the transformer testing process into multiple specialized test stations. Via automated switching devices and digital management control, it achieves unmanned or minimally manned testing, significantly improving testing efficiency, data accuracy and operational safety.Specification| PTTS | ||||
| Test Item | Standard | |||
| Transformer No-Load/Load Test | IEC60076-1 | |||
| Transformer Induced Voltage Test | IEC60076-3/EC60270 | |||
| Transformer Temperature Rising Test | lEC60076-2 | |||
| Applied Voltage Test | IEC60076-3 | |||
| Impulse Voltage Test | IEC60076-4 | |||
| Transformer Class | 66kV | 110kV | 220kV | 500kV |
| Power Source | 500kVA | 1000kVA | 1500kVA | 1800kVA |
| Step-up transformer | 1000kVA | 2000kVA | 3000kVA | 4000kVA |
| Capacitor Bank | 10MVar | 40MVar | 100MVar | 180MVar |
| Impulse Voltage Generator | 600kV | 800kV | 1600kV | 2400kV |
| 60kJ | 80kJ | 160kJ | 240kJ | |
| AC Test Transformer | 200kV | 300kV | 300kV | 300kV |
| 1A | 1A | 1A | 1.5A | |
Measurement of voltage ratio.
Check of voltage vector relationship.
Measurement of No-load loss & current harmonics analysis of No-load current.
Measurement of load loss & short-circuit impedance.
Calculation of total loss, impedance, regulation & efficiency.
Tap changer operation.
Measurement of insulation resistance.
AC voltage withstand test.
Induced AC voltage test with partial discharge.
Measurement of dissipation power factor (tan o) and capacitance.
Bushing current transformer test (BCT). Type Tests: Special Tests: Temperature rise test.
Lightening & switching impulse test.
Sound level test. Sweep frequency response analysis.
Partial discharge tests.
Dissolved Gas Analysis (DGA). Key Features: Integrated platform for routine & type tests of power transformers
Modular configuration, easy to expand and customize
Automatic switching & sequencing to streamline workflow
PLC-based centralized control with data recording & report output
High accuracy measurement and stable test performance
Multi-level safety interlocks for safe high-voltage operationSystem Setup & Application
Shanghai Lanqi Electric Co., Ltd.
Shanghai Lanqi Electric Co., Ltd.Launch Electric began with a bold vision: to transform China's high-voltage industry through innovation and engineering excellence. Starting with global imports and local assembly, we've grown into a trusted solutions partner for the power sector. Our journey is defined by precision, reliability, and a deep commitment to quality—delivering systems that meet the evolving demands of modern energy infrastructure.Over the years, we've expanded our capabilities, introduced cutting-edge testing technologies, and built lasting relationships based on trust, performance, and technical expertise. Today, Launch Electric continues to lead the way—pushing boundaries, setting benchmarks, and powering progress across every project we deliver.Our MissionOur VisionTo drive progress in high-voltage testing through innovation, safeguard energy security with precision and reliability, and empower the sustainable development of global energy infrastructure.To lead the revolution in high-voltage testing with innovative technologies, safeguarding global energy security and a sustainable future.Skilled GIS ProfessionalsOutfitted with Complete ToolsComprehensive InstallationOur OEM-trained technicians deliver precise diagnostics, swift repairs, and dependable GIS system recovery.Equipped with precision tools like SF6 handling kits, vacuum pumps, detectors, and safety-certified PPE, our teams guarantee secure and accurate servicing.Trained professionals handle all aspects of GIS/AIS services including erection, dismantling, testing, commissioning, shutdowns, and retrofitswith efficiency and expertise.FAQ1. How is our product? We are manufacturer, so preferential price and high quality can guarantee.
2. How soon to get price?
Usually provide within 6 hours once receiving inquiry. If you are very urgent, please call us then we will do in priority.
3. Whal is your terms of delivery?
EXW,FOB, CFR, CIF, ect. Pls select your most conveient and cost effective.
4. When there is difficulty in using ?
We will first provide equipment operation manual, operation video, or provide training through remote video call. Ifnecessary, engineers will serve on door.
5. What about the leading time for production?
That depends on order qty and product item. For normal items, usually within 3 working days. Delivery time is determined by the logistics , generally is 5-7 days.
6.How to send?
For most of our customers, we provide door-to-door service. You only to through import customs clearance proceduresand pay the import tariff.
7. How is packing and will the goods be damaged?
We will pack standard export packing for everyequipment, so far there is no damage yet, pls no worry.
Related Products






